Quality Assurance
For consistency of and adherence to quality control systems a quality manual is prepared and distributed to all persons concerned. This quality control Manual describes the system adopted at “SHRIJEE” for the Design, Manufacture, Assembly, and Testing.
Raw Materials Control
All raw materials are received with manufacturer’s Test reports indicating the physical / chemical properties and other specific requirements as per the code. The test reports are verified for compliance with the code and purchase order. Random check tests are carried our and recorded on the goods received note.
In process Control
For in process control before start of manufacture, a quality plan is prepared for each job received and issued to all concerned. Shop Instruction sheets give detailed instruction/ acceptance norms for the shop supervisors/ inspectors. Welding control is exercised as stipulated in the Quality Control Manual. Welding quality is very closely monitored by welding Engineers. All pressure parts joints are stamped by the welders for identification.
For any new process of manufacturing to be used, the process is tried out on mock-up. Manufacturing, Engineering and Quality Control set up the parameters for process before starting the job.
Field Assembly
Field Assembly meets quality Requirement as per technical requirements of the contract. The site QC Engineer supervises the Field Assembly/ Construction work for quality requirements.
All the welding is carried out in accordance with approved WPS by qualified welders. The site QC Engineer inspects the welding done at site.
Calibration of Measuring Instruments
All measuring instruments are calibrated using gauges/instruments whose accuracy is traceable to National standard. Pressure gauges are calibrated with the dead weight tester every three months.
Shipping Inspection
All products are checked by QC for painting, identification marking and proper protection and for compliance with special requirements of the contract if any.
Testing Facilities
“Shrijee” Test House has all the facilities that are needed to fulfill the codes requirements. Facilities for non-destructive testing, mechanical testing & chemical composition partially available at this shop and for remaining different outside agency have been employed.